Currently I'm with IBM Lab Services, and only have small test clusters myself. I'm not sure I've done v3.5->4.1 upgrades, but this warning about upgrading all nodes within a "short time" is something that's always been in the upgrade instructions, and I've been through many of these (I've been a gpfs sysadmin since 2002 :-) http://www.ibm.com/support/knowledgecenter/SSFKCN_3.5.0/com.ibm.cluster.gpfs... https://www.scribd.com/document/51036833/GPFS-V3-4-Concepts-Planning-and-Ins... BTW: One relevant issue I saw recently was a rolling upgrade from 4.1.0 to 4.1.1.7 where we had some nodes in the cluster running 4.1.0.0. Apparently there had been some CCR message format changes in a later release that made 4.1.0.0-nodes not being able to properly communicate with 4.1.1.4 -- even though they should be able to co-exist in the same cluster according to the upgrade instructions. So I guess the more versions you mix in a cluster, the more likely you're to hit a version mismatch bug. Best to feel a tiny bit uneasy about not running same version on all nodes, and hurry to get them all upgraded to the same level. And also, should you hit a bug during this process, the likely answer will be to upgrade everything to same level. -jf On Tue, Dec 6, 2016 at 12:00 AM, Aaron Knister <aaron.s.knister@nasa.gov> wrote:
Thanks Jan-Frode! If you don't mind sharing, over what period of time did you upgrade from 3.5 to 4.1 and roughly how many clients/servers do you have in your cluster?
-Aaron
On 12/5/16 5:52 PM, Jan-Frode Myklebust wrote:
I read it as "do your best". I doubt there can be problems that shows up after 3 weeks, that wouldn't also be triggerable after 1 day.
-jf
man. 5. des. 2016 kl. 22.32 skrev Aaron Knister <aaron.s.knister@nasa.gov <mailto:aaron.s.knister@nasa.gov>>:
Hi Everyone,
In the GPFS documentation (http://www.ibm.com/support/knowledgecenter/SSFKCN_4.1.0/com .ibm.cluster.gpfs.v4r1.gpfs300.doc/bl1ins_migratl.htm) it has this to say about the duration of an upgrade from 3.5 to 4.1:
> Rolling upgrades allow you to install new GPFS code one node at a time without shutting down GPFS > on other nodes. However, you must upgrade all nodes within a short time. The time dependency exists >because some GPFS 4.1 features become available on each node as soon as the node is upgraded, while >other features will not become available until you upgrade all participating nodes.
Does anyone have a feel for what "a short time" means? I'm looking to upgrade from 3.5.0.31 to 4.1.1.10 in a rolling fashion but given the size of our system it might take several weeks to complete. Seeing this language concerns me that after some period of time something bad is going to happen, but I don't know what that period of time is.
Also, if anyone has done a rolling 3.5 to 4.1 upgrade and has any anecdotes they'd like to share, I would like to hear them.
Thanks!
-Aaron
-- Aaron Knister NASA Center for Climate Simulation (Code 606.2) Goddard Space Flight Center (301) 286-2776 _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org <http://spectrumscale.org> http://gpfsug.org/mailman/listinfo/gpfsug-discuss