Hello, I'm currently looking after a GPFS setup with six nodes and about 80TB disk. The current GPFS level is 3.4.0 and I'm looking to upgrade it. The (vague) plan is to do a rolling upgrade of the various nodes working through them one at a time leaving the cluster manager node until last then doing a failover of that role to another node and then upgrading the last host. Is there a standard upgrade methodology for GPFS systems or any tricks, tips or traps to know about before I go ahead with this? Also is it 'safe' assume that I could upgrade straight from 3.4.0 to 3.5.x or are there any intermediary steps that need to be performed as well? Any help or advice appreciated, Steff Watkins ----- Steff Watkins Natural History Museum, Cromwell Road, London,SW7 5BD Systems programmer Email: s.watkins@nhm.ac.uk Systems Team Phone: +44 (0)20 7942 6000 opt 2 ======== "Many were increasingly of the opinion that they'd all made a big mistake in coming down from the trees in the first place. And some said that even the trees had been a bad move, and that no one should ever have left the oceans." - HHGTTG
