Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale
Hi Jonathan todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ). I think that such a server is a little bit to big just to be a single NSD server. Note that i use for each GPFS service a dedicated node. So if i would go for 4 NSD server, 6 protocol nodes and 2 tsm backup nodes and at least 3 test server a total of 11 server is needed. Inhm 4xS822L could handle this and a little bit more quite well. Of course blade technology could be used or 1U server. With kind regards Hajo -- Unix Systems Engineer MetaModul GmbH +49 177 4393994 <div>-------- Ursprüngliche Nachricht --------</div><div>Von: Jonathan Buzzard <jonathan@buzzard.me.uk> </div><div>Datum:2017.04.24 13:14 (GMT+01:00) </div><div>An: gpfsug main discussion list <gpfsug-discuss@spectrumscale.org> </div><div>Betreff: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale </div><div> </div>On Mon, 2017-04-24 at 12:28 +0200, Hans-Joachim Ehlers wrote:
@All
does anybody uses virtualization technologies for GPFS Server ? If yes what kind and why have you selected your soulution.
I think currently about using Linux on Power using 40G SR-IOV for Network and NPIV/Dedidcated FC Adater for storage. As a plus i can also assign only a certain amount of CPUs to GPFS. ( Lower license cost / You pay for what you use)
I must admit that i am not familar how "good" KVM/ESX in respect to direct assignment of hardware is. Thus the question to the group
For the most part GPFS is used at scale and in general all the components are redundant. As such why you would want to allocate less than a whole server into a production GPFS system in somewhat beyond me. That is you will have a bunch of NSD servers in the system and if one crashes, well the other NSD's take over. Similar for protocol nodes, and in general the total file system size is going to hundreds of TB otherwise why bother with GPFS. I guess there is currently potential value at sticking the GUI into a virtual machine to get redundancy. On the other hand if you want a test rig, then virtualization works wonders. I have put GPFS on a single Linux box, using LV's for the disks and mapping them into virtual machines under KVM. JAB. -- Jonathan A. Buzzard Email: jonathan (at) buzzard.me.uk Fife, United Kingdom. _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
Hi As tastes vary, I would not partition it so much for the backend. Assuming there is little to nothing overhead on the CPU at PHYP level, which it depends. On the protocols nodes, due the CTDB keeping locks together across all nodes (SMB), you would get more performance on bigger & less number of CES nodes than more and smaller. Certainly a 822 is quite a server if we go back to previous generations but I would still keep a simple backend (NSd servers), simple CES (less number of nodes the merrier) & then on the client part go as micro partitions as you like/can as the effect on the cluster is less relevant in the case of resources starvation. But, it depends on workloads, SLA and money so I say try, establish a baseline and it fills the requirements, go for it. If not change till does. Have fun From: "service@metamodul.com" <service@metamodul.com> To: gpfsug main discussion list <gpfsug-discuss@spectrumscale.org> Date: 24/04/2017 15:21 Subject: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale Sent by: gpfsug-discuss-bounces@spectrumscale.org Hi Jonathan todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ). I think that such a server is a little bit to big just to be a single NSD server. Note that i use for each GPFS service a dedicated node. So if i would go for 4 NSD server, 6 protocol nodes and 2 tsm backup nodes and at least 3 test server a total of 11 server is needed. Inhm 4xS822L could handle this and a little bit more quite well. Of course blade technology could be used or 1U server. With kind regards Hajo -- Unix Systems Engineer MetaModul GmbH +49 177 4393994 -------- Ursprüngliche Nachricht -------- Von: Jonathan Buzzard Datum:2017.04.24 13:14 (GMT+01:00) An: gpfsug main discussion list Betreff: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale On Mon, 2017-04-24 at 12:28 +0200, Hans-Joachim Ehlers wrote:
@All
does anybody uses virtualization technologies for GPFS Server ? If yes what kind and why have you selected your soulution.
I think currently about using Linux on Power using 40G SR-IOV for Network and NPIV/Dedidcated FC Adater for storage. As a plus i can also assign only a certain amount of CPUs to GPFS. ( Lower license cost / You pay for what you use)
I must admit that i am not familar how "good" KVM/ESX in respect to direct assignment of hardware is. Thus the question to the group
For the most part GPFS is used at scale and in general all the components are redundant. As such why you would want to allocate less than a whole server into a production GPFS system in somewhat beyond me. That is you will have a bunch of NSD servers in the system and if one crashes, well the other NSD's take over. Similar for protocol nodes, and in general the total file system size is going to hundreds of TB otherwise why bother with GPFS. I guess there is currently potential value at sticking the GUI into a virtual machine to get redundancy. On the other hand if you want a test rig, then virtualization works wonders. I have put GPFS on a single Linux box, using LV's for the disks and mapping them into virtual machines under KVM. JAB. -- Jonathan A. Buzzard Email: jonathan (at) buzzard.me.uk Fife, United Kingdom. _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss Ellei edellä ole toisin mainittu: / Unless stated otherwise above: Oy IBM Finland Ab PL 265, 00101 Helsinki, Finland Business ID, Y-tunnus: 0195876-3 Registered in Finland
I agree with Luis -- why so many nodes? """ So if i would go for 4 NSD server, 6 protocol nodes and 2 tsm backup nodes and at least 3 test server a total of 11 server is needed. """ If this is your whole cluster, why not just 3x P822L/P812L running single partition per node, hosting a cluster of 3x protocol-nodes that does both direct FC for disk access, and also run backups on same nodes ? No complications, full hw performance. Then separate node for test, or separate partition on same nodes with dedicated adapters. But back to your original question. My experience is that LPAR/NPIV works great, but it's a bit annoying having to also have VIOs. Hope we'll get FC SR-IOV eventually.. Also LPAR/Dedicated-adapters naturally works fine. VMWare/RDM can be a challenge in some failure situations. It likes to pause VMs in APD or PDL situations, which will affect all VMs with access to it :-o VMs without direct disk access is trivial. -jf On Mon, Apr 24, 2017 at 2:42 PM, Luis Bolinches <luis.bolinches@fi.ibm.com> wrote:
Hi
As tastes vary, I would not partition it so much for the backend. Assuming there is little to nothing overhead on the CPU at PHYP level, which it depends. On the protocols nodes, due the CTDB keeping locks together across all nodes (SMB), you would get more performance on bigger & less number of CES nodes than more and smaller.
Certainly a 822 is quite a server if we go back to previous generations but I would still keep a simple backend (NSd servers), simple CES (less number of nodes the merrier) & then on the client part go as micro partitions as you like/can as the effect on the cluster is less relevant in the case of resources starvation.
But, it depends on workloads, SLA and money so I say try, establish a baseline and it fills the requirements, go for it. If not change till does. Have fun
From: "service@metamodul.com" <service@metamodul.com> To: gpfsug main discussion list <gpfsug-discuss@spectrumscale.org> Date: 24/04/2017 15:21 Subject: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale Sent by: gpfsug-discuss-bounces@spectrumscale.org ------------------------------
Hi Jonathan todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ). I think that such a server is a little bit to big just to be a single NSD server. Note that i use for each GPFS service a dedicated node. So if i would go for 4 NSD server, 6 protocol nodes and 2 tsm backup nodes and at least 3 test server a total of 11 server is needed. Inhm 4xS822L could handle this and a little bit more quite well.
Of course blade technology could be used or 1U server.
With kind regards Hajo
-- Unix Systems Engineer MetaModul GmbH +49 177 4393994 <+49%20177%204393994>
-------- Ursprüngliche Nachricht -------- Von: Jonathan Buzzard Datum:2017.04.24 13:14 (GMT+01:00) An: gpfsug main discussion list Betreff: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale
On Mon, 2017-04-24 at 12:28 +0200, Hans-Joachim Ehlers wrote:
@All
does anybody uses virtualization technologies for GPFS Server ? If yes what kind and why have you selected your soulution.
I think currently about using Linux on Power using 40G SR-IOV for Network and NPIV/Dedidcated FC Adater for storage. As a plus i can also assign only a certain amount of CPUs to GPFS. ( Lower license cost / You pay for what you use)
I must admit that i am not familar how "good" KVM/ESX in respect to direct assignment of hardware is. Thus the question to the group
For the most part GPFS is used at scale and in general all the components are redundant. As such why you would want to allocate less than a whole server into a production GPFS system in somewhat beyond me.
That is you will have a bunch of NSD servers in the system and if one crashes, well the other NSD's take over. Similar for protocol nodes, and in general the total file system size is going to hundreds of TB otherwise why bother with GPFS.
I guess there is currently potential value at sticking the GUI into a virtual machine to get redundancy.
On the other hand if you want a test rig, then virtualization works wonders. I have put GPFS on a single Linux box, using LV's for the disks and mapping them into virtual machines under KVM.
JAB.
-- Jonathan A. Buzzard Email: jonathan (at) buzzard.me.uk Fife, United Kingdom.
_______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss_______ ________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
Ellei edellä ole toisin mainittu: / Unless stated otherwise above: Oy IBM Finland Ab PL 265, 00101 Helsinki, Finland Business ID, Y-tunnus: 0195876-3 Registered in Finland
_______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
Jan-Frode Myklebust <janfrode@tanso.net> hat am 24. April 2017 um 15:14 geschrieben: I agree with Luis -- why so many nodes?
Many ? IMHO it is not that much. I do not like to have one server doing more than one task. Thus a NSD Server does only serves GPFS. A Protocol server serves either NFS or SMB but not both except IBM says it would be better to run NFS/SMB on the same node. A backup server runs also on its "own" hardware. So i would need at least 4 NSD Server since if 1 fails i am losing only 25% of my "performance" and still having a 4/5 quorum. Nice in case an Update of a NSD failed. Each protocol service requires at least 2 nodes and the backup service as well. I can only say that with that approach i never had problems. I have be running into problems each time i did not followed that apporach. But of course YMMV But keep in mind that each service might requires different GPFS configuration or even slightly different hardware. Saying so i am a fan of having many GPFS Server ( NSD, Protocol , Backup a.s.o ) and i do not understand why not to use many nodes ^_^ Cheers Hajo
On Mon, 2017-04-24 at 14:21 +0200, service@metamodul.com wrote:
Hi Jonathan todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ). I think that such a server is a little bit to big just to be a single NSD server.
So don't buy it for an NSD server then :-)
Note that i use for each GPFS service a dedicated node. So if i would go for 4 NSD server, 6 protocol nodes and 2 tsm backup nodes and at least 3 test server a total of 11 server is needed. Inhm 4xS822L could handle this and a little bit more quite well.
I think you are missing the point somewhat. Well by several country miles and quite possibly an ocean or two to be honest. Spectrum scale is supposed to be a "scale out" solution. More storage required add more arrays. More bandwidth add more servers etc. If you are just going to scale it all up on a *single* server then you might as well forget GPFS and do an old school standard scale up solution. JAB. -- Jonathan A. Buzzard Email: jonathan (at) buzzard.me.uk Fife, United Kingdom.
On Mon, 24 Apr 2017 14:21:09 +0200, "service@metamodul.com" said:
todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ).
We look at it the other way around: Today's hardware is so powerful that you can build a cluster out of a stack of fairly low-end 1U servers (we have one cluster that's built out of Dell r630s). And it's more robust against hardware failures than a VM based solution - although the 822 seems to allow hot-swap of PCI cards, a dead socket or DIMM will still kill all the VMs when you go to replace it. If one 1U out of 4 goes down due to a bad DIMM (which has happened to us more often than a bad PCI card) you can just power it down and replace it....
On Mon, 2017-04-24 at 11:29 -0400, valdis.kletnieks@vt.edu wrote:
On Mon, 24 Apr 2017 14:21:09 +0200, "service@metamodul.com" said:
todays hardware is so powerful that imho it might make sense to split a CEC into more "piece". For example the IBM S822L has up to 2x12 cores, 9 PCI3 slots ( 4×16 lans & 5×8 lan ).
We look at it the other way around: Today's hardware is so powerful that you can build a cluster out of a stack of fairly low-end 1U servers (we have one cluster that's built out of Dell r630s). And it's more robust against hardware failures than a VM based solution - although the 822 seems to allow hot-swap of PCI cards, a dead socket or DIMM will still kill all the VMs when you go to replace it. If one 1U out of 4 goes down due to a bad DIMM (which has happened to us more often than a bad PCI card) you can just power it down and replace it....
Hate to say but the 822 will happily keep trucking when the CPU (assuming it has more than one) fails and similar with the DIMM's. In fact mirrored DIMM's is reasonably common on x86 machines these days, though very few people ever use it. That said CPU failures are incredibly rare in my experience. The only time I have ever come across a failed CPU was on a pSeries machine and then it was only because the backup was running really slow (it was running TSM) that prompted us to look closer and see what had happened. Monitoring (Zenoss) was not setup to register the event because like when does a CPU fail and the machine keep running! I am not 100% sure on the 822 put I suspect that the DIMM's and any socketed CPU's can be hot swapped in addition to the PCI card's which I have personally done on pSeries machines. However it is a stupidly over priced solution to run GPFS, because there are better or at the very least vastly cheaper ways to get the same level of reliability. JAB. -- Jonathan A. Buzzard Email: jonathan (at) buzzard.me.uk Fife, United Kingdom.
On Mon, 24 Apr 2017 17:24:29 +0100, Jonathan Buzzard said:
Hate to say but the 822 will happily keep trucking when the CPU (assuming it has more than one) fails and similar with the DIMM's. In
How about when you go to replace the DIMM? You able to hot-swap the memory without anything losing its mind? (I know this is possible in the Z/series world, but those usually have at least 2-3 more zeros in the price tag).
Hi 822 is an entry scale out Power machine, it has limited RAS compared with the high end ones (870/880). The 822 needs to be down for CPU / DIMM replacement: https://www.ibm.com/support/knowledgecenter/5148-21L/p8eg3/p8eg3_83x_8rx_kic... . And it is not a end user task. You can argue that, I owuld but it is the current statement and you pay for support for these kind of stuff. From: valdis.kletnieks@vt.edu To: gpfsug main discussion list <gpfsug-discuss@spectrumscale.org> Date: 24/04/2017 20:58 Subject: Re: [gpfsug-discuss] Used virtualization technologies for GPFS/Spectrum Scale Sent by: gpfsug-discuss-bounces@spectrumscale.org On Mon, 24 Apr 2017 17:24:29 +0100, Jonathan Buzzard said:
Hate to say but the 822 will happily keep trucking when the CPU (assuming it has more than one) fails and similar with the DIMM's. In
How about when you go to replace the DIMM? You able to hot-swap the memory without anything losing its mind? (I know this is possible in the Z/series world, but those usually have at least 2-3 more zeros in the price tag). [attachment "attqolcz.dat" deleted by Luis Bolinches/Finland/IBM] _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss Ellei edellä ole toisin mainittu: / Unless stated otherwise above: Oy IBM Finland Ab PL 265, 00101 Helsinki, Finland Business ID, Y-tunnus: 0195876-3 Registered in Finland
participants (6)
-
Hans-Joachim Ehlers -
Jan-Frode Myklebust -
Jonathan Buzzard -
Luis Bolinches -
service@metamodul.com -
valdis.kletnieks@vt.edu
