Hi, I understand gpfs 4.2.3 is end of support this coming September. The support page https://www.ibm.com/support/knowledgecenter/en/STXKQY/gpfsclustersfaq.html#l... indicates that gpfs version 5.0 will not run on rhel6 and is unsupported. 1. Is there extended support available for 4.2.3 on rhel6 for gpfs servers and clients? 2. Is gpfs 5.0 unsupported for both rhel6 servers and clients? Thanks, Renata
On 19/02/2020 23:34, Renata Maria Dart wrote:
Hi, I understand gpfs 4.2.3 is end of support this coming September. The support page
https://www.ibm.com/support/knowledgecenter/en/STXKQY/gpfsclustersfaq.html#l...
indicates that gpfs version 5.0 will not run on rhel6 and is unsupported.
1. Is there extended support available for 4.2.3 on rhel6 for gpfs servers and clients? 2. Is gpfs 5.0 unsupported for both rhel6 servers and clients?
Given RHEL6 expires in November anyway you would only be buying yourself a couple of months which seems pointless. You need to be moving away from both. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG
Well, if you were buying some form of extended Life Support for Scale, then you might also be expecting to buy extended life for RedHat. RHEL6 has extended life support until June 2024. Sure its an add on subscription cost, but some people might be prepared to do that over OS upgrades. Simon On 20/02/2020, 10:34, "gpfsug-discuss-bounces@spectrumscale.org on behalf of Jonathan Buzzard" <gpfsug-discuss-bounces@spectrumscale.org on behalf of jonathan.buzzard@strath.ac.uk> wrote: On 19/02/2020 23:34, Renata Maria Dart wrote: > Hi, I understand gpfs 4.2.3 is end of support this coming September. The support page > > https://www.ibm.com/support/knowledgecenter/en/STXKQY/gpfsclustersfaq.html#l... > > indicates that gpfs version 5.0 will not run on rhel6 and is unsupported. > > 1. Is there extended support available for 4.2.3 on rhel6 for gpfs servers and clients? > 2. Is gpfs 5.0 unsupported for both rhel6 servers and clients? > Given RHEL6 expires in November anyway you would only be buying yourself a couple of months which seems pointless. You need to be moving away from both. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
On 20/02/2020 10:41, Simon Thompson wrote:
Well, if you were buying some form of extended Life Support for Scale, then you might also be expecting to buy extended life for RedHat. RHEL6 has extended life support until June 2024. Sure its an add on subscription cost, but some people might be prepared to do that over OS upgrades.
I would recommend anyone going down that to route to take a *very* close look at what you get for the extended support. Not all of the OS is supported, with large chunks being moved to unsupported even if you pay for the extended support. Consequently extended support is not suitable for HPC usage in my view, so start planning the upgrade now. It's not like you haven't had 10 years notice. If your GPFS is just a storage thing serving out on protocol nodes, upgrade one node at a time to RHEL7 and then repeat upgrading to GPFS 5. It's a relatively easy invisible to the users upgrade. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG
Fred, It may be that some HPC users "have to" reverify the results of their computations as being exactly the same as a previous software stack and that is not a minor task. Any change may require this verification process..... Ken Atkjnson On Thu, 20 Feb 2020, 14:35 Frederick Stock, <stockf@us.ibm.com> wrote:
This is a bit off the point of this discussion but it seemed like an appropriate context for me to post this question. IMHO the state of software is such that it is expected to change rather frequently, for example the OS on your laptop/tablet/smartphone and your web browser. It is correct to say those devices are not running an HPC or enterprise environment but I mention them because I expect none of us would think of running those devices on software that is a version far from the latest available. With that as background I am curious to understand why folks would continue to run systems on software like RHEL 6.x which is now two major releases(and many years) behind the current version of that product? Is it simply the effort required to upgrade 100s/1000s of nodes and the disruption that causes, or are there other factors that make keeping current with OS releases problematic? I do understand it is not just a matter of upgrading the OS but all the software, like Spectrum Scale, that runs atop that OS in your environment. While they all do not remain in lock step I would think that in some window of time, say 12-18 months after an OS release, all software in your environment would support a new/recent OS release that would technically permit the system to be upgraded.
I should add that I think you want to be on or near the latest release of any software with the presumption that newer versions should be an improvement over older versions, albeit with the usual caveats of new defects.
Fred __________________________________________________ Fred Stock | IBM Pittsburgh Lab | 720-430-8821 stockf@us.ibm.com
----- Original message ----- From: Jonathan Buzzard <jonathan.buzzard@strath.ac.uk> Sent by: gpfsug-discuss-bounces@spectrumscale.org To: "gpfsug-discuss@spectrumscale.org" <gpfsug-discuss@spectrumscale.org> Cc: Subject: [EXTERNAL] Re: [gpfsug-discuss] GPFS 5 and supported rhel OS Date: Thu, Feb 20, 2020 6:24 AM
On 20/02/2020 10:41, Simon Thompson wrote:
Well, if you were buying some form of extended Life Support for Scale, then you might also be expecting to buy extended life for RedHat. RHEL6 has extended life support until June 2024. Sure its an add on subscription cost, but some people might be prepared to do that over OS upgrades.
I would recommend anyone going down that to route to take a *very* close look at what you get for the extended support. Not all of the OS is supported, with large chunks being moved to unsupported even if you pay for the extended support.
Consequently extended support is not suitable for HPC usage in my view, so start planning the upgrade now. It's not like you haven't had 10 years notice.
If your GPFS is just a storage thing serving out on protocol nodes, upgrade one node at a time to RHEL7 and then repeat upgrading to GPFS 5. It's a relatively easy invisible to the users upgrade.
JAB.
-- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
_______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
On Thu, Feb 20, 2020 at 04:29:40PM +0000, Ken Atkinson wrote:
Fred, It may be that some HPC users "have to" reverify the results of their computations as being exactly the same as a previous software stack and that is not a minor task. Any change may require this verification process..... Ken Atkjnson
We have this problem too, but at the same time the same people require us to run supported software and remove software versions with known vulnerabilities. The compromise we've worked out for the researchers is to have them track which software versions they used for a particular run/data release. The researchers who care more will have a validation suite that will (hopefully) call out problems as we do required upgrades. At some point, it's simply unrealistic to keep legacy systems around, though we do have a lab that needs a Solaris/SPARC system just to run a 15-year-old component of a pipeline for which they don't have source code... -- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine
Instead of keeping whole legacy systems around, could they achieve the same with a container built from the legacy software?
On Feb 20, 2020, at 11:59 AM, Skylar Thompson <skylar2@uw.edu> wrote:
On Thu, Feb 20, 2020 at 04:29:40PM +0000, Ken Atkinson wrote:
Fred, It may be that some HPC users "have to" reverify the results of their computations as being exactly the same as a previous software stack and that is not a minor task. Any change may require this verification process..... Ken Atkjnson
We have this problem too, but at the same time the same people require us to run supported software and remove software versions with known vulnerabilities. The compromise we've worked out for the researchers is to have them track which software versions they used for a particular run/data release. The researchers who care more will have a validation suite that will (hopefully) call out problems as we do required upgrades.
At some point, it's simply unrealistic to keep legacy systems around, though we do have a lab that needs a Solaris/SPARC system just to run a 15-year-old component of a pipeline for which they don't have source code...
-- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
On Thu, Feb 20, 2020 at 12:14:40PM -0500, David Johnson wrote:
Instead of keeping whole legacy systems around, could they achieve the same with a container built from the legacy software?
That is our hope, at least once we can get off CentOS 6 and run containers. :) Though containers aren't quite a panacea; there's still the issue of insecure software being baked into the container, but at least we can limit what the container can access more easily than running outside a container.
On Feb 20, 2020, at 11:59 AM, Skylar Thompson <skylar2@uw.edu> wrote:
On Thu, Feb 20, 2020 at 04:29:40PM +0000, Ken Atkinson wrote:
Fred, It may be that some HPC users "have to" reverify the results of their computations as being exactly the same as a previous software stack and that is not a minor task. Any change may require this verification process..... Ken Atkjnson
We have this problem too, but at the same time the same people require us to run supported software and remove software versions with known vulnerabilities. The compromise we've worked out for the researchers is to have them track which software versions they used for a particular run/data release. The researchers who care more will have a validation suite that will (hopefully) call out problems as we do required upgrades.
At some point, it's simply unrealistic to keep legacy systems around, though we do have a lab that needs a Solaris/SPARC system just to run a 15-year-old component of a pipeline for which they don't have source code...
-- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
_______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
-- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine
On 20/02/2020 16:59, Skylar Thompson wrote: [SNIP]
We have this problem too, but at the same time the same people require us to run supported software and remove software versions with known vulnerabilities.
For us, it is a Scottish government mandate that all public funded bodies in Scotland are Cyber Essentials Plus compliant. That's 10 days from a critical vulnerability till your patched. No if's no buts, just do it. So while where are not their yet (its a work in progress to make this as seamless as possible) frankly running unpatched systems for years on end because we are too busy/lazy to validate a new system is completely unacceptable. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG
On Thu, 20 Feb 2020 23:38:15 +0000, Jonathan Buzzard said:
For us, it is a Scottish government mandate that all public funded bodies in Scotland are Cyber Essentials Plus compliant. That's 10 days from a critical vulnerability till your patched. No if's no buts, just do it.
Is that 10 days from vuln dislosure, or from patch availability? The latter can be a headache, especially if 24-48 hours pass between when the patch actually hits the streets and you get the e-mail, or if you have other legal mandates that patches be tested before production deployment. The former is simply unworkable - you *might* be able to deploy mitigations or other work-arounds, but if it's something complicated that requires a lot of re-work of code, you may be waiting a lot more than 10 days for a patch....
On 21/02/2020 02:00, Valdis Klētnieks wrote:
On Thu, 20 Feb 2020 23:38:15 +0000, Jonathan Buzzard said:
For us, it is a Scottish government mandate that all public funded bodies in Scotland are Cyber Essentials Plus compliant. That's 10 days from a critical vulnerability till your patched. No if's no buts, just do it.
Is that 10 days from vuln dislosure, or from patch availability?
Patch availability. Basically it's a response to the issue a couple of years ago now where large parts of the NHS in Scotland had serious problems due to some Windows vulnerability for which a patch had been available for some months. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG
On Fri, 21 Feb 2020 11:04:32 +0000, Jonathan Buzzard said:
Is that 10 days from vuln dislosure, or from patch availability?
Patch availability. Basically it's a response to the issue a couple of
That's not *quite* so bad. As long as you trust *all* your vendors to notify you when they release a patch for an issue you hadn't heard about. (And that no e-mail servers along the way don't file it under 'spam')
On 23/02/2020 04:43, Valdis Klētnieks wrote:
On Fri, 21 Feb 2020 11:04:32 +0000, Jonathan Buzzard said:
Is that 10 days from vuln dislosure, or from patch availability?
Patch availability. Basically it's a response to the issue a couple of
That's not *quite* so bad. As long as you trust *all* your vendors to notify you when they release a patch for an issue you hadn't heard about.
Er, what do you think I am paid for? Specifically it is IMHO the job of any systems administrator to know when any critical patch becomes available for any software/hardware that they are using. To not be actively monitoring it is IMHO a dereliction of duty, worthy of a verbal and then written warning. I also feel that the old practice of leaving HPC systems unpatched for years on end is no longer acceptable. From a personal perspective I have in now over 20 years never had a system that I have been responsible for knowingly compromised. I would like it to stay that way because I have no desire to be explaining to higher ups why the HPC facility was hacked. The fact that the Scottish government have mandated I apply patches just makes my life easier because any push back from the users is killed dead instantly; I have too, go moan at your elective representative if you want it changed. In the meantime suck it up :-) JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG
On Sun, 23 Feb 2020 12:20:48 +0000, Jonathan Buzzard said:
That's not *quite* so bad. As long as you trust *all* your vendors to notify you when they release a patch for an issue you hadn't heard about.
Er, what do you think I am paid for? Specifically it is IMHO the job of any systems administrator to know when any critical patch becomes available for any software/hardware that they are using.
You missed the point. Unless you spend your time constantly e-mailing *all* of your vendors "Are there new patches I don't know about?", you're relying on them to notify you when there's a known issue, and when a patch comes out. Redhat is good about notification. IBM is. But how about things like your Infiniband stack? OFED? The firmware in all your devices? The BIOS/UEFI on the servers? If you're an Intel shop, how do you get notified about security issues in the Management Engine stuff (and there's been plenty of them). Do *all* of those vendors have security lists? Are you subscribed to *all* of them? Do *all* of them actually post to those lists?
On Sun, Feb 23, 2020 at 04:58:03PM -0500, Valdis Klētnieks wrote:
On Sun, 23 Feb 2020 12:20:48 +0000, Jonathan Buzzard said:
That's not *quite* so bad. As long as you trust *all* your vendors to notify you when they release a patch for an issue you hadn't heard about.
Er, what do you think I am paid for? Specifically it is IMHO the job of any systems administrator to know when any critical patch becomes available for any software/hardware that they are using.
You missed the point.
Unless you spend your time constantly e-mailing *all* of your vendors "Are there new patches I don't know about?", you're relying on them to notify you when there's a known issue, and when a patch comes out.
Redhat is good about notification. IBM is.
But how about things like your Infiniband stack? OFED? The firmware in all your devices? The BIOS/UEFI on the servers? If you're an Intel shop, how do you get notified about security issues in the Management Engine stuff (and there's been plenty of them). Do *all* of those vendors have security lists? Are you subscribed to *all* of them? Do *all* of them actually post to those lists?
We put our notification sources (Nessus, US-CERT, etc.) into our response plan. Of course it's still a problem if we don't get notified, but part of the plan is to make it clear where we're willing to accept risk, and to limit our own liability. No process is going to be perfect, but we at least know and accept where those imperfections are. -- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine
Hi Frederick, ours is a physics research lab with a mix of new eperiments and ongoing research. While some users embrace and desire the latest that tech has to offer and are actively writing code to take advantage of it, we also have users running older code on data from older experiments which depends on features of older OS releases and they are often not the ones who wrote the code. We have a mix of systems to accomodate both groups. Renata On Thu, 20 Feb 2020, Frederick Stock wrote:
This is a bit off the point of this discussion but it seemed like an appropriate context for me to post this question. IMHO the state of software is such that it is expected to change rather frequently, for example the OS on your laptop/tablet/smartphone and your web browser. It is correct to say those devices are not running an HPC or enterprise environment but I mention them because I expect none of us would think of running those devices on software that is a version far from the latest available. With that as background I am curious to understand why folks would continue to run systems on software like RHEL 6.x which is now two major releases(and many years) behind the current version of that product? Is it simply the effort required to upgrade 100s/1000s of nodes and the disruption that causes, or are there other factors that make keeping current with OS releases problematic? I do understand it is not just a matter of upgrading the OS but all the software, like Spectrum Scale, that runs atop that OS in your environment. While they all do not remain in lock step I would think that in some window of time, say 12-18 months after an OS release, all software in your environment would support a new/recent OS release that would technically permit the system to be upgraded. I should add that I think you want to be on or near the latest release of any software with the presumption that newer versions should be an improvement over older versions, albeit with the usual caveats of new defects.
Fred __________________________________________________ Fred Stock | IBM Pittsburgh Lab | 720-430-8821 stockf@us.ibm.com ----- Original message ----- From: Jonathan Buzzard <jonathan.buzzard@strath.ac.uk> Sent by: gpfsug-discuss-bounces@spectrumscale.org To: "gpfsug-discuss@spectrumscale.org" <gpfsug-discuss@spectrumscale.org> Cc: Subject: [EXTERNAL] Re: [gpfsug-discuss] GPFS 5 and supported rhel OS Date: Thu, Feb 20, 2020 6:24 AM On 20/02/2020 10:41, Simon Thompson wrote: > Well, if you were buying some form of extended Life Support for > Scale, then you might also be expecting to buy extended life for > RedHat. RHEL6 has extended life support until June 2024. Sure its an > add on subscription cost, but some people might be prepared to do > that over OS upgrades.
I would recommend anyone going down that to route to take a *very* close look at what you get for the extended support. Not all of the OS is supported, with large chunks being moved to unsupported even if you pay for the extended support.
Consequently extended support is not suitable for HPC usage in my view, so start planning the upgrade now. It's not like you haven't had 10 years notice.
If your GPFS is just a storage thing serving out on protocol nodes, upgrade one node at a time to RHEL7 and then repeat upgrading to GPFS 5. It's a relatively easy invisible to the users upgrade.
JAB.
-- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG _______________________________________________ gpfsug-discuss mailing list gpfsug-discuss at spectrumscale.org http://gpfsug.org/mailman/listinfo/gpfsug-discuss
On Thu, Feb 20, 2020 at 11:23:52AM +0000, Jonathan Buzzard wrote:
On 20/02/2020 10:41, Simon Thompson wrote:
Well, if you were buying some form of extended Life Support for Scale, then you might also be expecting to buy extended life for RedHat. RHEL6 has extended life support until June 2024. Sure its an add on subscription cost, but some people might be prepared to do that over OS upgrades.
I would recommend anyone going down that to route to take a *very* close look at what you get for the extended support. Not all of the OS is supported, with large chunks being moved to unsupported even if you pay for the extended support.
Consequently extended support is not suitable for HPC usage in my view, so start planning the upgrade now. It's not like you haven't had 10 years notice.
If your GPFS is just a storage thing serving out on protocol nodes, upgrade one node at a time to RHEL7 and then repeat upgrading to GPFS 5. It's a relatively easy invisible to the users upgrade.
I agree, we're having increasing difficulty running CentOS 6, not because of the lack of support from IBM/RedHat, but because the software our customers want to run has started depending on OS features that simply don't exist in CentOS 6. In particular, modern gcc and glibc, and containers are all features that many of our customers are expecting that we provide. The newer kernel available in CentOS 7 (and now 8) supports large numbers of CPUs and large amounts of memory far better than the ancient CentOS 6 kernel as well. -- -- Skylar Thompson (skylar2@u.washington.edu) -- Genome Sciences Department, System Administrator -- Foege Building S046, (206)-685-7354 -- University of Washington School of Medicine
On 19/02/2020 23:34, Renata Maria Dart wrote:
Hi, I understand gpfs 4.2.3 is end of support this coming September.
A planning question at this stage. Do IBM intend to hold to this date or is/could there be a relaxation due to COVID-19? Basically I was planning to do the upgrade this summer, but what with working from home I am less keen to do a a 4.2.3 to 5.x upgrade while not on hand to the actual hardware. Obviously if we have to we have to, just want to know where we stand. JAB. -- Jonathan A. Buzzard Tel: +44141-5483420 HPC System Administrator, ARCHIE-WeSt. University of Strathclyde, John Anderson Building, Glasgow. G4 0NG